Cafe Design & Fitouts

Coffee Shop Design & Fitouts in Australia

Café Designers & Shopfitters with 20 years experience

Australia has one of the most sophisticated coffee cultures in the world. From the hidden laneway espresso bars of Melbourne to the sun-drenched coastal brunch spots of the Gold Coast and Sydney’s high-paced CBD kiosks, the standard for “the third place”—that space between home and work—is incredibly high.

Launching & Renovating A Café

Launching or renovating a cafe isn’t just about choosing a color palette; it’s a complex engineering project that must navigate local council regulations, strict health codes, and the demanding workflow of a high-volume barista station. At Petra Group, we specialize in end-to-end cafe fitouts that blend Australian lifestyle aesthetics with world-class operational design.

As we move through 2026, the Australian cafe scene is evolving. Customers are looking for more than a caffeine fix; they are seeking an “experience-first” environment.

The most successful modern fitouts are designed for flexibility. We are seeing a surge in “Morning-to-Evening” venues—spaces that function as a bright, minimalist cafe at 8:00 AM and transform into a moody, intimate wine bar or event space by 6:00 PM.

Understanding Costs: Budgeting for Your Fitout

How much does a cafe fitout cost in Australia?” is the most common question we hear. While every project is unique, here is a general guide for 2026:

Fitout Tier Estimated Cost (per sqm) Best For
Basic / Refresh $1,500 – $2,200 Coffee-only kiosks, small renovations, or “hole-in-the-wall” shops.
Standard / Mid-Range $2,500 – $4,000 Typical suburban cafes with a full kitchen, 30+ seats, and custom joinery.
Premium / High-End $4,500+ CBD flagship stores, complex architectural designs, and multi-level venues.

Our Step-by-Step Fitout Process

Phase 1: Consultation & Concept (Week 1-2)

We meet on-site to discuss your vision, target demographic, and budget. We perform a site audit to check existing plumbing, gas, and electrical capacities.

Phase 2: Design & Documentation (Week 3-6)

Our interior designers create 3D renders and detailed floor plans. We prepare all technical drawings required for council or private certifier approval.

Phase 3: Construction & Joinery (Week 7-12)

This is where the magic happens. Our licensed builders, plumbers, and electricians move in. Our custom joinery team builds your counters and banquette seating off-site to ensure a rapid, high-quality installation.

Phase 4: Handover & Launch

We perform a final walkthrough, ensure all health permits are signed off, and hand over the keys. Your dream cafe is ready for its first “Grand Opening” latte.

“Who will be managing my project?” You will work directly with our experienced cafe shopfitters and project managers. You can even ask specifically for our lead specialists, Abby or Paul, who have overseen numerous successful cafe launches across Sydney, Melbourne, and Brisbane.

FAQ

Learn more about services

Does Petra Group handle both the front-of-house design and commercial kitchen setup?

Yes. We provide a comprehensive “end-to-end” solution. Our in-house designers create aesthetically pleasing dining areas and floor plans, while our technical team specifies and installs full commercial kitchens—including custom stainless steel fabrication and heavy-duty catering equipment—tailored to your menu and volume needs.

Can you help with council approvals and DA paperwork?

Absolutely. Navigating Australian regulatory requirements can be complex. Petra Group assists with the necessary paperwork for Development Applications (DA), Complying Development Certificates (CDC), and private certification. We ensure your cafe design meets Australian Standard AS 4674-2004 for the design and construction of food premises.

What is the typical cost of a cafe fitout with Petra Group?

Fitout costs vary based on size and complexity. For a small to medium-sized coffee shop, refurbishment typically ranges from $50,000 to $150,000. For large-scale cafes with heavy-duty equipment and high-end custom joinery, costs can reach $250,000 or more. We provide itemized quotes to help you manage your budget effectively.

How long does the design and fitout process usually take?

Most cafe projects take between 8 to 16 weeks from the initial consultation to the grand opening. This timeline includes the design phase, site inspections, obtaining council permits, procurement of equipment, and the actual on-site construction and installation.

Do you offer financing options for equipment and fitout costs?

Yes. To help you manage your working capital, we offer flexible finance options with low weekly rentals and no establishment fees. This allows you to fund the entire project—including both the construction and the kitchen equipment—without a large upfront cash outlay.